VERDICT: pass (Round 1 — v1 assembly audit) Critic Role: Independent systems critic Observed Defects on v1 Proof Strip: - Optional v2 enhancement — Seg #05 (t=18.60s-23.80s): Upgrade 'THREE WORKSHOPS ALIGNED' from a single-stream shot to a synchronized 3-panel triptych locking Processes 01, 02, and 03 visually to the pulse. Largest Gap: All v1 shots were clean and cut-free; upgrading Seg #05 to a 3-panel triptych makes the three-workshop rhythmic coordination visually explicit. Causal Hypothesis: Single-stream segment mode used in v1 for Seg #05. Falsifiable Repair Condition: Use `mode='triptych'` with `clips=['6ee8ef44', '9b8b1f1e', 'aeebdc87']` in Seg #05 so watchmaking, loom shuttle, and factory stamping lock together visually before the normal-speed maintenance interruption (`2ab95576`). Strength to Preserve: All three work processes, the normal-speed bearing-oiling maintenance interruption (`2ab95576`), the wide factory-floor contextual reveal (`eba7d1c4`), and the worker stopping at the close (`135e3a64`).